06 August 2017

Organizational skills

I spent a good 2 hours the other day going through every washer that I had looking for 2 washers for the nosewheel axle. I broke down and was about to order them off of vans when in a last ditch effort to establish sanity I pulled out my inventory sheet. Low and behold, the washers that I could not find were B/O ordered on my last kit purchase!!!


Andair Fuel Valve

A while ago I ordered an Andair valve direct from Andair. I finally got an adapter plate fabricated and had a chance to install the valve.



Everything at this point is great in terms of fit of the valve. The one thing I have to do is send my valve to filter line back to TS Flightlines to get a shortened version. The standard line length from Tom is about 2 inches too long in my scenario, and rather than have the lines and fittings under stress, I am going to get a shorter line.







Com1 Antenna Doubler

I am going to put COM1 under the left rear passenger seat and COM2 on (or behind) the cabin top. I built a doubler for COM1 but need to wait until my wife gets home so I can shoot the rivets. I did have an annoying slow down on this one. I ran out of 6d nails for use with the dimpler dies (the ones you use with a blind rivet puller). So I had to run to ace hardware for some 6d nails for the plane. (I just like saying I had to run to the store to get some nails for the plane).



Static System

Everyone seems to put their static system up the left side of the plane. That probably makes sense, because my pitot and AOA tubes will be coming out of the left wing and it would be nice to keep all three tubes in the same run. As I was routing everything though I did not really like how the run was looking. The left side of the plane has the baggage door, so you are forced to drop down to under the rear baggage floor and seat following the battery cable. I went back and forth in an internal debate on this for more time than I care to share. I think ultimately I am going to make the static run up the right side of the plane to not have to drop under the floor. I ordered some clickbonds and will make the decision when they show up.

Cabin Top drilling

One of the things that I really have been looking forward to. Match drilling the cabin top holes to the fuselage!


Cable conduit runs

A lot of people use the blue 1" cable conduit from HomeDepot, and for some reason, every home depot in my area is showing a stock of 4 or 5 rolls and not a single home depot could actually locate the items. I finally found some 1" black lightweight conduit on amazon.

I ended up punching some 1.5 inch holes in my ribs to accept some locking grommets that I ordered off of McMaster (5269T62). On top of that, I had ordered some nylon 1" cable clamps from SteinAir to lock all of the conduit along the ribs.


Sorry for all of the fiberglass dust. You can imagine the other section that I am currently working on.


Beringer Wheels

If you drill back a couple of months in the blogs you will see that I picked up a full Beringer set of wheels and brakes. I finally got around to getting my nose wheel duracoated (yeah, I still have a bunch of duracoat left over so I am using it in any location that is going to get really dirty).